Setup Configuration
- Ethn Switch and Switch Controller: Connect the Ethn switch to the Ethn switch controller, which should be connected to the switch tower (central base station).
- Switch Controller: Ensure it is correctly configured and tested for performance.
Wireless Testing
- Wireless Bridge: Use a wireless bridge to connect the switch controller to the network. This allows testing the network in a wireless environment.
- Test Signal: Send a test signal through the wireless bridge to ensure the network is functioning correctly in a wireless context.
Physical Layer Testing
- Physical Layer Layer 1 Test: Send a test signal through the physical layer and measure the response to ensure proper connection and functionality.
- Physical Layer Layer 2 Test: Check the network layer 1 layer 2 connections to ensure data routing is correct.
- Physical Layer Layer 3 Test: Test the layer 3 connections to verify routing and congestion control algorithms.
Wireless Layer 3 Test
- Test Signal: Use a test signal to ensure the wireless layer 3 connections are functioning correctly, focusing on routing and congestion control.
Ensure Everything Works
- Physical Connections: Verify that all Ethernet cables are properly installed and functioning.
- Switch Functionality: Check that the Ethn switch and switch controller are operating as expected.
- Layer 2 and Layer 3 Functionality: Ensure the network layer 1 layer 2 and layer 3 connections are functioning correctly.
Additional Considerations
- Clean Bus: Ensure the physical layer has a clean bus to avoid issues like clock skew.
- Layer 1, 2, and 3 Tests: Perform thorough tests on each layer to ensure comprehensive network functionality.
By following these steps, you can effectively test a sing-box network and ensure its robustness and reliability.







京公网安备11000000000001号
京ICP备11000001号